35 Years experience in Water Control Equipment (Rodney Hunt, Fontaine, GA Industries, VAG and other manufacturer's) equipment installations. We help you get it right and comply with Manufacturer's requirements, and Engineer's / Owner's need for documentation of proper installation of the equipment.
Whether its required cycle testing or water testing of the completed installation, our experience leads the way. When you buy your gates or valves package-in start-up service by Peabody Water Associates.
Most Gate and Valve Operators require field adjustment of their operating equipment. Our experience in electric operators (Rotork, Auma, Limitorque, EIM, and others,) hydraulic systems and controls (such as those by Rodney Hunt), as well as manual gear-drives, can lead the way to success.
Aging and In-Service Gates, Valves and Operators require routine exercise, maintenance and inspection. Peabody Water Associates can design a maintenance plan for your equipment that ensures the equipment remains in-service and operable.
Aging equipment may already be experieicing operational difficulties or concerns. Peabody Water Associates can provide such inspections, evaluation, and repair as may be needed. Our familiarity with manufacturer's in this industry ensures that we can help you get any needed parts.
(manual, electric and hydraulic operators)
Often heard comments include: "best training ever" ; "you told us the things we need to know"; your operations and maintenance staff will receive training that is perfectly suited to the equipment and to their needs. Our Trainer's years of experience and technical writing, receives accolades with every session. Training is an important element for all new and existing equipment, our Trainer can work from the manufacturer's literature and submittal documents to construct both classroom and hands-on training covering: Equipment Descriptions, Safety, Operation, Maintenance, Troubleshooting and Repair.
Similarly, we offer technical writing and submittal of operation and maintenance manuals. Our goal is compliance with specification requirements, to achieve approval of such documents, and speed your project to completion.